We set link speed and the number of interfaces according to the workload, required bandwidth and failure scenario. If virtualization and storage traffic is heavy, 10 GbE or faster links and splitting traffic across separate interfaces are considered.
When Windows Server is licensed by physical cores, all cores in the server must be licensed, with a minimum of 8 core licenses per processor and 16 per server. In this model, CPU choice also affects license cost.