Online ToolsAll PlatformsSupport Request[email protected]
Server installation, configuration, incident response and scheduled maintenance. Active Directory, virtualization and backup are managed with the same discipline.
We build switching, routing, cabling and wireless networks with VLAN segmentation and redundant uplinks, and provide regular maintenance and fault support.
PLC, PROFINET/PROFIBUS and SCADA communication, IT/OT network segmentation and industrial field connectivity. We install and monitor without stopping the production line.
Firewall, VPN, endpoint security and threat prevention. We reduce the attack surface and measure and report the risks.
We work with you on compliance with ISO 27001, IATF 16949, TISAX and similar standards, covering risk assessment, control design, documentation and audit preparation.
We build and maintain corporate websites, WordPress and CMS platforms, intranet and SharePoint portals, document management, and form and approval workflows, and keep them secure and up to date.
IP cameras, recording and central management infrastructure. We plan blind spots, retention periods and the camera network around the risks of each site.
On-premises AI deployment, model optimization and secure integration. Your data stays inside your organization.
Since 1998 we have been working in enterprise IT infrastructure, networking, security, software and operations management.
Short technical notes on problems we encounter in the field in IT infrastructure and the steps to solve them.
Requests, monitoring, reporting and management screens in one place.
We explain what we changed in real infrastructures and why in server, virtualization, backup and recovery projects: the technical decision, the implementation step and the business result together.
JMW Jant wanted to reduce its VMware license renewal costs and keep using its existing Dell hardware. After assessing three VxRail P570F nodes and one PowerEdge R740, the migration to Windows Server 2025 Hyper-V was planned and carried out.
USD 45,000 + VAT
Based on JMW Jant’s operating history. Hardware: 3 VxRail P570F + 1 PowerEdge R740. Critical virtual machines are replicated asynchronously with Hyper-V Replica; backup is run separately.